Florida HVAC Testing, Adjusting, & Balancing for
USAA Southeast Regional Office (SERO) Campus, Tampa, FL

SITA-Tab Florida HVAC Testing, Adjusting, & Balancing for USAA Southeast Regional Office (SERO) Campus|(813) 949-1999

Owner/Client: USAA
Project Size: 500,000 sq ft.
Architect: Elements
Building Automation Contractor: Siemens Industry, Inc
Mech. Engineer: Tilden, Lobnitz, Cooper
TAB Firm: Southern Independent Testing Agency (SITA)
Construction Management: ABI Construction Services

This multi phase project included mechanical renovations as well as HVAC controls upgrade to the Tampa Office. The Campus includes a seven-story main building, a child development center and several support structures. The building houses a 500+ seat cafeteria with a full-service kitchen, conference rooms, loading docks, drive-in claims area, fitness center, and storage areas.

SITA provided Florida Testing, Adjusting, & Balancing (TAB) services for the 500,000 sq ft building. Which included extensive TAB services related to the ventilation and chilled water systems to ensure a functional building. SERO was awarded the LEED Gold certification — Existing Buildings from the U.S. Green Building Council, the first existing building in the state of Florida to receive this certification."